COOTECH – ERDF 2021–27
SPW Recherche
At least two independent companies with operating sites in Wallonia collaborate on a portfolio of research projects. They assess the economic impact in advance, start at technology readiness level 3 or higher and aim for at least level 6.
Question to settle
Two Walloon SMEs each lead one of the portfolio’s two projects. The general calls table mentions ONTIME and leaves the COOTECH intention field blank. What must the consortium lead do first, and who enters the projects?
Choose an answer to see the reasoning
The lead uploads a joint file to ONTIME now.
Reconsider this choice · The general table omits a required first step for COOTECH. The lead must send the declaration with the meeting request before the Calista filing.
The lead arranges the meeting with the declaration, then sets up the portfolio in Calista. Both SMEs enter their own projects.
Correct · This follows the three steps in the COOTECH procedure. The lead identifies both projects in the portfolio. Each SME, as project holder, supplies the data and annexes for its own project.
After the meeting, each SME creates its own one-project portfolio in Calista.
Reconsider this choice · SPW requires at least two projects in the same portfolio. The lead creates that portfolio, then the two holders complete their respective project records.
Next step
The consortium lead requests a meeting with SPW Recherche and attaches the completed declaration of intent. After the meeting, the lead follows the technical officer’s recommendations and creates the portfolio in Calista, identifying at least two projects. Each project holder then enters its own project data and annexes.
Status and scope
SPW processes ordinary COOTECH applications year-round. The COOTECH procedure sets out the preliminary meeting and the Calista filing steps. The partners also agree on roles, research costs, risks and rights to results.
Official passages
- SPW · COOTECH · Déclaration d’intention et création du portefeuille Procedure, steps 0–1. Send the declaration with the meeting request, then create the portfolio in Calista. The form is listed under Formulaires.
- SPW · COOTECH · Le dépôt des projets Procedure, step 2. Each project holder supplies its own data and annexes.
Read the original wording · FR
Chaque porteur de projet encode sur la plateforme CALISTA les données relatives à son projet.
Procédure · 2/ Le dépôt des projets - COOTECH Programme description and link to the COOTECH application procedure.
- Appels en cours General ONTIME instruction above the table. The ordinary COOTECH row gives rolling intake and leaves the intention field blank.
Related guides
- Which Walloon ERDF measure funded a demonstration unit for SMEs?SPW · FEDER 2014–2020 · Three measures in the 2014–2020 programme financed different parts of research. Measure 2.1.1 supported advanced equipment. Measure 2.1.2 supported research projects and the use of their results. Measure 2.2.2 supported accredited research centres setting up demonstration units for SMEs. The funding decision identifies which measure applied to a particular file.
- Win4Company · split a mixed R&D budgetService public de Wallonie · Recherche · The grant rate for industrial research and the recoverable advance rate for experimental development apply to different eligible costs.