How much of a packaging pilot could Circular by Design fund?
FOD Volksgezondheid / SPF Santé publique
A Belgian packaging SME tested a first design with €20,000 already financed. In its 2026 application, it proposed a separate pilot with €100,000 in otherwise eligible new costs. The single undertaking had already received €240,000 in Belgian general de minimis aid within the relevant three years at the proposed award date.
Question to settle
Assuming the project otherwise qualifies, what is the largest grant request that fits both limits?
Choose an answer to see the reasoning
€102,000, or 85% of both phases together.
Reconsider this choice · The first €20,000 financed work already carried out. The call allows a distinct follow-on stage and excludes double funding of the same activities.
€85,000, or 85% of the new pilot.
Reconsider this choice · This is the call’s percentage ceiling. A grant of €85,000 would bring the undertaking’s three-year total to €325,000.
€60,000, with €40,000 of the new pilot to finance separately.
Correct · The 85% rule allows up to €85,000 on €100,000. The remaining de minimis allowance is €300,000 − €240,000 = €60,000. Use the lower amount when structuring the request. Selection and the actual award are separate decisions.
Next step
Separate the deliverables and invoices for each phase. Check the award dates for the whole single undertaking, complete the aid declaration and identify financing for the €40,000 balance.
Status and scope
Worked example for the federal 2026 call. Applications closed on 7 September 2026 at 09:00.
Official passages
- FOD Volksgezondheid · Circular by Design, vademecum Pp. 9–10 · reeds gefinancierde activiteiten, financieringspercentage en de-minimissteun.
- SPF Santé publique · Circular by Design, vadémécum Ce qui sort du périmètre · Taux de financement du projet · Règles relatives aux aides d’État.
- Commission Regulation (EU) 2023/2831 Article 2(2) and Article 3(2), (3) and (7) · single undertaking, grant date and ceiling.
- FOD Volksgezondheid · Projectoproep Circular by Design Subsidie · Selectie en evaluatie van de projecten.
Related guides
- How much de minimis headroom does the group have?European Commission · EUR-Lex · Calculate the ceiling for a single undertaking before promising a grant.
- What can a selected construction consortium put in its budget?SPW Économie, Emploi, Recherche · Circular Wallonia · A Namur company and several building contractors want to test a shared system for reusing components. Suppose their proposal was selected under the second Boost4Circularity call. Their €80,000 pilot needs a testing partner, common specifications and staff training.
- Circular by Design · testing circular products and servicesFPS Public Health · Environment · The federal call supported circular design in construction, textiles, packaging and electrical or electronic equipment. It required sufficient maturity, measurable effects and potential for replication.